DivingCo-Header

Telstra Australia

Derwent River cable installation Macquarie Point to Bellerive Hobart Tasmania.

Laying of cable across Derwent River Macquarie Point to Bellerive

Laying of cable across Derwent River Macquarie Point to Bellerive

Diving Duties:

  1. Survey cable route for obstructions and seabed conditions.
  2. Mobilise cable lay barge and lay cable as required.
  3. Assist with hauling of cables through HDPE conduits.
  4. Install articulated pipe for 450m and survey cable to 15m of water depth.
Laying of cable across Derwent River Macquarie Point to Bellerive

Cable crew setting up for cable haul back through HDPE conduits Macquarie Point Hobart.